3 stage sluice box design diagram

Posted at:April 29, 2013[ 4.9 - 1829 Ratings]

Homemade 3 Stage Under Current Sluice Box catching Gold

The 3 stage sluice box – starting construction. In developing plans for a homemade sluice box, the more time you spend thinking about your design, the better.

»More detailed

The Gold Dredge –

Their equipment was limited to gold pans, sluice boxes and rockers. …. The latest technological design is the new 3 stage sluice box. As indicated in the diagram gravel is dredged into the suction hose and is delivered to the sluice box

»More detailed

4" Dredge Instructions –

The 3 stage sluice box requires more water than a normal sluice box to operate a tapered orifice (jet), by a special designed water pump. As indicated in the diagram gravel is dredged into the suction hose and is delivered to the sluice

»More detailed

HIGH PERFORMANCE 3 STAGE SLUICE 4", 5 – Bowen's Hideout

3 stage sluice diagram. HIGH PERFORMANCE 3 STAGE SLUICE 4", 5" ,6" and 8 " Models This final recovery system is designed to capture any gold that was tied up with clays in hard packed material. The reports are in from the field and everyone loves the new Keene 3 stage sluice box and its fine gold recovery.

»More detailed

Underflow sluice box – Gold Prospecting Forum – Nugget Shooter Forums

Underflow sluice box – posted in Gold Prospecting Forum: Hi guys and PDF file for Keene's 4" 3 stage dredge, it has a diagram of the sluice in

»More detailed

SLUICE BOX AND METHOD OF USE – Patent application

23 Sep 2010 Sluice having three stages of material classification including, a movable primary The sluice box is designed to allow maximum portability without sacrificing …. SLUICE BOX AND METHOD OF USE diagram and image

»More detailed

Sluice Box Use and Set-Up – Black Mining

Information on how sluice boxes work, as well as sluice box use and set up Stand by a river in flood stage and you can often hear the larger rocks and

»More detailed

Double-screen Classification System in Dredging – The New 49ers

23 Nov 2011 2) Placing a classification screen towards the head of the sluice box, and then of any of these designs, each which would likely be comparable to the other. …. must be accomplished in stages; first to drop the 3/8-minus material out of the ….. If you look closely at the diagram just above, you will see another

»More detailed

APPLICATION OF HYDROCYCLONES FOR RECOVERY OF FINE

Size – specific gravity distribution of products of two stage. CW cyclone concentration shape factor, sluice box design and operating parameters. It is felt that a …. Figure 3 is a diagram of the CW cyclone, which was fabricated from pyrex glass.

»More detailed

placer gold recovery methods placer gold recovery methods

Figure 3. Classifying action of sluice riffles . …. 12. Figure 16. Schematic diagram of a single Reichert cone . ….. The final stage is known as scavenging. Scavenging is …. box on skids or a poorly designed sled, a rocker sorts materials through

»More detailed

WC/97/061 The design, construction and testing of a simple shaking

3 Particle-size distribution of feed (BG 5) and tailings (BG 6) from Kias …. include inappropriate sluice box design & operation, high feed and wash water rates and long stage iii) of this recommended gold recovery scheme. A set of (volume %) was estimated by comparison with standard area % diagrams, such as are

»More detailed

Gold panning,gold mining,gold prospecting, with ROTAPAN,twenty

To my surprise, the Rotapan recovered more gold than the sluice box! extra engine and pump for it, new 5" Keene 3 stage dredge, 16 hp diesel volume (450 gpm) pump, 12 hp Honda CLICK on the image to see the diagram workings of the ROTAPAN gold machine, a review of the ROTAPAN in …. magnificent design!

»More detailed

Extrac-TEC's Heavy Particle Concentration (HPC) technology allows

Our design feedback and operating experience includes Simple, secure and rapid final recovery stage actually enters the sluice box. Please refer to the attached Material Flow and Production Capacity Diagrams for additional information. Electrical Supply must be 3- Phase 380-480V and 50/60Hz. (The HPC-30

»More detailed

Mining Industry Profile: Gold Placers – US Environmental Protection

This Technical Resource Document consists of three sections. The first is EPA's ….. 1-23. Figure 1-5. Diagram of a Sluice Box Including Hungarian Riffles .

»More detailed

Thoughts on hand mining flour gold – Alaska Mining and Diving Supply

14 Sep 2012 3. The few remaining mine-able deposits tend to be quite remote …. Another option that should be considered is modular recovery device design. All of us have seen the old photos of lengthy sluice boxes used by the old hand miners. Consider wooden flumes for water delivery to a classification stage that

»More detailed

10. Pond Outlet Structures –

(a) Design a water discharge capacity large enough so that the pond can be drained 3. The inside diameter of outlet pipes will determine the water discharge (a) Do not build your pond too deep , and make the cut in stages, draining off the …. A sluice gate consists of a protected opening in the pond dike that can be

»More detailed

Plan and design your own home made suction dredge for gold mining

How to plan, design and build your own homemade gold suction dredge so you can Building a 3 stage sluice box for a gold dredge …. done up on using a gold dredge, including a diagram as to how a suction dredge works, take a look at:

»More detailed

Regulations of Internal Water Installations and – Kahramaa

3. Application Categories : Prior to starting any installation activities related to services …. Meter Cabinet : Means the box design specifically for KAHRAMAA use for …. Allusion of the water network control valve or sluice valve, must be as per …. Schematic water diagram submittals at BP stage should include all the above

»More detailed

Equipment Specification for Zimbabwe version 3

3. Comparing Barrels with Special-Amalgamating Plates. …. improvised sluice boxes (known as James Tables). They process from …. In order to design the transportable demonstration units, the main components of the units must be studied. The main components of a transportable unit is shown in the diagram below:

»More detailed

UT Admin Code R317-3. Design Requirements for Wastewater

vi. diagram of system showing major components. 5. 3. The maximum design rate of flow or peak-daily rate of flow is defined as: ….. Final draft must be submitted for review and approval, no later than at the 90 percent stage of construction in the ….. The sewer outfalls, headwalls, manholes, gate boxes, or other structures

»More detailed